Negros II - 27MW

NEGROS II Hydroelectric Plant

Hydroelectric project with a design flow of 24.5 m3 / s and a gross head of 136 m. It has two horizontal axis Francis turbines.

Second stage of two projects in cascade, with a 2300 m long tunnel

CARBON Ingeniería was contracted by Hidroeléctrica Cuatro Bocas S.A. to carry out the feasibility, and the final design of the civil works and the floodgates as well. The plant is owned by the Servicios Públicos de Heredia.

Project Information

Type: Hydroelectric Plant
Status: Under construction (2017)

Specs:

Installed capacity: 27.8 MW

Client

Client: Hidroeléctrica Cuatro Bocas S.A.
Location: Upala, Costa Rica

  • Address

    Oficentro Alquimia, 100 mts south from John Deere’s dealership
    La Uruca, San José, Costa Rica.
    Tel: (506) 2290 4070 | Fax: (506) 2290 7122
    This email address is being protected from spambots. You need JavaScript enabled to view it.