MONTECRISTO Hydrolectric Plant
This project’s water intake is HP El Canadá’s discharge, through a rectangular concrete channel, conducing water to an antechamber where pressurized conduction begins. It has a low-pressure piping system, surge tank and high-pressure piping. The power house hosts 2 Francis units with a total installed capacity of 12.2 MW and a design flow of 3.4 m3/s.
Total installed capacity of 12.2 MW and 13.4 m3/s design flow
CARBON Engineering was hired by Global Energy International Ltd. for pre-feasibility study conduction.