Cuyamel, 8 MW

CUYAMEL hydroelectric plant

This hydroelectric project uses water from the Frio River through a lateral intake structure with a 16 m high concrete dam, bottom discharge gate and a sediment removal system. This is a novel underground pressure desander using a special slotted pipe for sediment extraction. Water is led by a conduit system comprising a tunnel and a pressure line, the latter made of reinforced fiberglass polyethylene. The powerhouse features two Francis turbines.

Features an underground pressure sand trap unique in Central America.

CARBON Engineering was hired by the project owner COHCUY S.A. for the pre - feasibility and feasibility studies , final design and construction plans for all civil works of the project, including the floodgates. Follow-up visits were also made during construction.

Project Information

Type: hydroelectric
Status: In operation since July 2007

Metrics

Installed capacity: 8 MW

Client

Client: Compañía Hidroeléctrica Cuyamel S.A.
Location: Departament of Cortés, Honduras

  • Address

    Oficentro Alquimia, 100 mts south from John Deere’s dealership
    La Uruca, San José, Costa Rica.
    Tel: (506) 2290 4070 | Fax: (506) 2290 7122
    This email address is being protected from spambots. You need JavaScript enabled to view it.