SAN MARTÍN Hydroelectric Plant
The Project includes a diversion dam with a sandtrap, a 5.35 km long steel pressure pipe, of which 1.45 km is 764 mm diameter, and 3.9 km is 813 mm. The powerhouse houses two Pelton units.
High pressure steel penstock, 5.4 km long
Carbon Engineering was hired by DERESA for the final design and construction drawings of the Steel penstock and anchor blocks.