San Martín, 3 MW

SAN MARTÍN Hydroelectric Plant

The Project includes a diversion dam with a sandtrap, a 5.35 km long steel pressure pipe, of which 1.45 km is 764 mm diameter, and 3.9 km is 813 mm. The powerhouse houses two Pelton units.

High pressure steel penstock, 5.4 km long

Carbon Engineering was hired by DERESA for the final design and construction drawings of the Steel penstock and anchor blocks.

Project Information

Type: Hydroelectric
Status: In operation since 2014

Metrics

Installed capacity:
2.9 MW

Client

Client: DERESA
Location: Departamento de Olancho, Honduras.